DEVELOPMENT

The development course--Henan mine crane co.,ltd

In January 20162016, secretary of the party committee Cui Peijun was elected to the 2015 annual "top ten economic annual figure" in henan province.
In October 20152015, the factory covers an area of 25000 square meters of European double beam line workshop (project 513) construction in full swing.
In September 2015, hoist gantry crane line workshop comprehensive construction project (198).
In August 2015, rolling composite wheel forging process intelligent assembly line put into production.
In February 2015, signed a strategic cooperation agreement with demag, both sides will collaborate on research and development and production of the new crane.
In January 2015, covers an area of 25000 square meters of six the workshop construction, officially put into use in June.
In November 20142014, one of the first baosteel group in the large tonnage crane loading of shipment.
In October 2014, lifting transportation machinery design and research institute and Beijing signed a strategic cooperation agreement, built by the German expert guidance and run single-girder crane flexible production line.
Construction began on May 3, 2014, double girder closure by the workshop.The whole workshop covers an area of 27400 square meters, with a total investment of more than 27400 ten thousand yuan.Steel pretreatment, blanking and double beam weld at an organic whole, can satisfy large tonnage crane manufacturing.
In March 2014, the cooperation with Beijing lifting transportation machinery design and research institute of the construction of the beam comprehensive standardization workshop go into mass production.
In June 20132013, constant temperature workshop ready for trial production.The workshop covers an area of 12000 square meters, processing center, doosan purchase Han Guodou mountain CMJ vertical machining center, robots and other advanced equipment, metal and stone is mainly used in the research and development and production of the new hoist.
In January 2013, the company's new culture square, multi-function hall officially put into use.
In June 20122012, the company built its own ecological NongYeYuan.Covers an area of 200 mu, with efficient agriculture as the guide.To meet the group needed for daily life poultry, meat and vegetables supply as our highest priority.
In February 2012, the acquisition of henan sheng source hoisting machinery co., LTD.Set a benchmark to the integration of changyuan county crane industry restructuring.
In October 20112011, "the mayor of xinxiang quality prize".
Established on September 22, 2011, all changyuan county and taxi co., LTD.
In May 20102010, the investment of 38 million yuan RMB, the establishment of the T1 workshop, the introduction of a u-shaped groove molding line, cover a molding line, slitting line, single beam forming production line once into my company formally running, has realized the single and double beam jointless line production.
In May 2010, the acquisition of days of the company, set up the ruins of bridge crane company.Perfect production workshop and equipment, for the four new team, alleviate the pressure company production.
On August 1, 20092009, V method casting steel casting workshop production line of building, completed in March 2010, put into operation in July 2010, daily consumption 10 tons of scrap steel, extend the industrial chain, increase the benefit.
In March 2009, five phase expansion project to start construction, the newly built workshop area more than 20000 square meters, the introduction of high precision nc machine tools and various large new equipment more than 40 sets.With a total investment of 65 million yuan.
In May 20082008, the company to break ground for the fourth stage project of the total investment is 54 million yuan, in August, double six class and class two, double double class five have been put into production.
On September 1, 20072007, no. 3 building ground-breaking, completed on January 1, 2008, put into use in September.
On April 6, 20062006, north campus multi-functional restaurant started the construction, completion on June 5, can accommodate 1000 people dining at the same time.
On March 1, 2006, the company bath center construction, completed on June 10, put into use.
Founded in March 2006, the acquisition of jinhua company, machining workshop, added a double beam shift.
In July 20052005, the acquisition of caxa crane co., LTD was launched three phase, built three double beam production factory, workshop and built machines, gourd workshop and double girder electric workshop.
On August 16, 20042004, the company no. 2 office building construction, completed on October 30, 2004.
In May 20032003, the investment of 40 million yuan RMB, the expansion of the midfielder production area, plant area of 50000 square meters.
In January 2003, no. 1 office officially put into use.
On November 8, 20022002, the company's first crane manufacturing, product model: LD5T - 18 5 m.
On September 30, 2002 issued a business license, established the henan mine crane co., LTD.
Break ground on April 28, 2002.